Case study · stadium turnaround
Tottenham Hotspur Stadium · Two concert nights into match-day. Pitch out, stage in, two sold-out shows, pitch back in for kick-off.
Tottenham Hotspur Stadium is purpose-built for this — the world's first true sport↔concert venue, with a retractable pitch that slides out, a grass deck for the artificial pitch underneath and a dividing wall that lets construction begin while a Premier League fixture is still in play. Concert 360° orchestrates the turnaround as a single operation.
Reference show · synthetic
Kojo Astra & The Reverie · Heartline Tour
2 nights · Late June (between domestic seasons)
Synthetic reference act — international R&B headliner, two consecutive nights, full broadcast cut, NFL-mode stage build.
Venue specs
- Capacity: 62,850
- Curfew: 22:30 (Haringey licence)
- Noise band: 65 dB(A) at sensitive receptor · noise-monitoring perimeter
- Build: 4 build · 2 show nights · 36-hour turnaround to football
- Modes: Concert mode (NFL-grade dividing wall · grass deck rolled out) · Football mode (retractable pitch in) · NFL mode · Hybrid (concert Saturday, football Sunday)
125k
Tickets across 2 nights
36h
Concert → football turnaround
62 dB
Avg perimeter · 3 dB inside band
0
Pitch damage points
What this venue actually demands.
Challenge 01
Sport↔concert mode
Retractable pitch slides out into its bay, 9,500 m² grass deck deployed over the artificial NFL pitch underneath, dividing wall positioned, stage built — all to a 96-hour clock from kick-off to first downbeat.
Challenge 02
36-hour turnaround
Strike concert build, retract stage, slide pitch back in, pitch checks signed off — football-ready by Sunday lunchtime.
Challenge 03
Haringey licence
Tighter noise band than Wembley, residential receptor monitoring and a hard 22:30 curfew with PRS reporting.
Challenge 04
Premium hospitality saturation
Stadium has the densest premium-seat product in UK live — 8,000 premium seats, the Tunnel Club, sky lounges and on-pitch experiences. All to be priced and packaged per show.
The engines that carry the load. All linked.
Venue Overlay
Sport↔concert mode timeline locked Day −90; pitch-out, grass-deck and dividing-wall sequence run as one Gantt with the club's operations team.
Stage & Rigging
Stage built to NFL-mode rigging spec; structural sign-off on dividing wall and on-stage cantilever Day −10.
Compliance
Haringey licence, PRS schedule and noise-monitoring perimeter live; orchestrator flags any cue at risk of breaching the 65 dB band.
VIP & Hospitality Suites
Tunnel Club, Sky Lounges, On-Pitch concert packages and corporate suites scaled and sold per night with fan-experience overlays.
Settlement & Payments
Per-night settlement reconciles primary, premium, ancillary and broadcast receipts inside 24 hours per show.
AI Orchestrator
Turnaround clock streamed live to artist, promoter, venue and football ops — orchestrator surfaces any task threatening the kick-off Sunday.
Live signals · ROC wall
Pitch retracted to bay 3 · grass deck deployment 64% complete
Dividing wall · structural sign-off received from venue ops
Tunnel Club uptake 98% · On-Pitch package sold out Night 1
Noise · perimeter receptor 62 dB(A) · 3 dB inside band
What the artist, venue and promoter walk away with.
Two sold-out concert nights followed by a Premier League match 36 hours later.
Zero pitch damage points logged; football handover signed inside the window.
Premium hospitality fully sold across both nights with bespoke packages.
Per-night settlement closed inside 24 hours; broadcast residuals secured.
Run your show with us