1X.Events

Engine 14 · Venue

Flagship engine
14Venue

Venue Overlay. Sport ↔ concert mode · pitch protection.

The venue-mode engine — sport-to-concert turnaround, pitch protection, retractable-pitch sequencing, dividing-wall management. The engine that makes Tottenham Hotspur Stadium's two-night-into-football-Sunday turnaround a single operation.

0

Pitch damage points

36h

Spurs concert→match turnaround

100%

Sign-offs versioned

01Why this engine

The job nobody else is doing properly.

Modern stadiums are mode-switchable machines — Wembley pitch-protected for a stadium concert, Tottenham Hotspur Stadium's pitch retracted into its bay, dividing wall positioned, NFL pitch underneath.

Venue Overlay treats the mode change as a single operation with the venue and the rights-holder, not two separate jobs.

Conversion checklists, sign-offs and recovery plans versioned per show.

02Capabilities

What it does.

01

Sport↔concert mode

Pitch retraction, grass deck deployment, dividing wall and conversion checklists.

02

Pitch protection

Per-zone protection plans signed off with venue and rights-holder.

03

Recovery plan

Pitch and venue recovery sequence signed off and time-stamped.

04

Conversion checklist

Per-zone checklist signed off as the venue moves between modes.

05

Rights-holder liaison

Single point of contact with venue ops, the FA and (where relevant) Premier League ops.

06

Insurance pack

Conversion sign-offs feed directly into the venue insurance pack.

03Workflow

How it runs, end to end.

  1. 01

    Mode-change timeline locked with venue and rights-holder Day −90.

  2. 02

    Per-zone protection and conversion checklists prepared.

  3. 03

    Show-day mode change executed against the checklist.

  4. 04

    Recovery and handover sign-offs captured and fed to insurance.

AI on venue overlay

Critical-path forecasting on the conversion timeline — flags any task threatening kick-off Sunday in time to re-sequence the strike.

04Outcomes

What changes for the artist and the venue.

FAQVenue Overlay answers

Common questions about Venue Overlay.

Yes — pitch-out, grass-deck and dividing-wall sequence is run as one Gantt with the club's operations team.

Venue ops and the relevant rights-holder (e.g. the FA at Wembley) sign off per-zone protection plans.

Take the next step

See Venue Overlay live in the platform.