1X.Events

Tooling · Engine compare

00Side-by-side capability matrix

Compare engines. Up to four at once.

Pick any combination of the 22 engines — calendar, routing, ticketing, broadcast, compliance, settlement and the rest — and read manifesto, capabilities, signals, workflow and AI angle in synchronised columns. The URL captures your selection; share it with the desk in one click.

Comparing 1 / 4

Stage & Rigging

Engine 04 · Production

Stage & Rigging

Tagline

Roof load · points · build days.

Open in Stage & Rigging Tagline

Intro

The structural engine — stage, B-stage, automation, roof load, rigging points, build days, structural sign-offs. The engine that decides whether the show can hang from the building.

Open in Stage & Rigging Intro

Manifesto

  • ·Rigging is where shows fail catastrophically. The Stage engine refuses to advance a load plan that does not hold against the venue's structural model.
  • ·Roof loads, point loads, B-stage cantilevers, automation paths — every weight modelled against every venue, every time.
  • ·Sign-offs are versioned, owned and time-stamped. No load goes up that has not been signed by a structural engineer of record.
Open in Stage & Rigging Manifesto

Signals

100%

Sign-offs versioned

0

Unsigned loads

5d

Wembley Stadium build

Open in Stage & Rigging Signals

Capabilities

  • Load plan

    Roof load, point load and dead-weight modelled against the venue's structural envelope.

  • Rigging plot

    Per-point rigging plots signed off by structural engineer of record.

  • Build schedule

    Build days, mid-build inspections and strike timed against curfew and freight.

  • B-stage / catwalks

    Cantilevers, automation paths and crowd interface modelled and signed.

  • Pitch protection

    Stadium pitch protection plans signed off with venue and (where relevant) the FA.

  • Insurance trail

    Structural sign-offs feed directly into the insurance and venue handover packs.

Open in Stage & Rigging Capabilities

Workflow

  1. 01

    Production Design hands over scenic and load assumptions.

  2. 02

    Load plan modelled against the venue; structural sign-off captured.

  3. 03

    Build, mid-build inspection and strike scheduled against curfew.

  4. 04

    Sign-offs and inspection logs fed to insurance and venue handover.

Open in Stage & Rigging Workflow

AI angle

AI on rigging

Anomaly detection on point loads — flags any load that drifts outside design tolerance during build or show, before it becomes an incident.

Open in Stage & Rigging AI angle

Outcomes

  • Every rigging point signed by an engineer of record.
  • Pitch protection plans accepted by venue and rights-holder.
  • Build schedule respects curfew, freight and crew rest.
  • Insurance pack issued direct from the rigging engine.
Open in Stage & Rigging Outcomes

Deep dive